The operating
record.
Five case studies across residential, community, commercial, and utility-scale operations. Real projects, real numbers, real outcomes.
25 MW · Upstate New York · Community Solar Recovery
- 94% Production Improvement
- On Budget
- Ahead of Schedule
Our client acquired a distressed 25 MW community solar portfolio out of bankruptcy. SunStrong managed the recovery — production restored to nearly double the prior rate.
Read full case study →Utility — 13 MW Transformer Repair
- 13 MW Solar Farm
- Performance index restored to 90%
- Parts sourced in 1/10 the expected time
A utility-scale solar farm was losing production to transformer bushing and arrestor degradation. SunStrong sourced replacement parts in one-tenth of the expected timeframe — at a repair cost equal to 2% of the resulting annual revenue increase.
Read full case study →Utility — 6.5 MW Inverter Recovery
- 26% Performance Improvement
- <1 Month Repair
- 0.4-Week Payback
An inverter breaker failure was draining production on a 6.5 MW utility-scale asset. SunStrong sourced and replaced the breaker in under a month — payback in under half a week.
Read full case study →